Gold Member Since 2016
Audited Supplier
Yantai Jinyang Cyclone Engineering Co., Ltd.

Classifying Hydrocyclone, Ore Dressing Hydrocyclone, Desliming Hydrocyclone manufacturer / supplier in China, offering Mining Separator Mineral Processing Ore Dressing Cyclone Equipment Manufacturer, Mineral Processing Hydrocyclone Mining Equipment, Jy Concentrate Hydraulic Cyclone and so on.

(/ )

Supplier Homepage Product Hydrocyclone Mining Separator Mineral Processing Ore Dressing Cyclone Equipment Manufacturer

Mining Separator Mineral Processing Ore Dressing Cyclone Equipment Manufacturer

FOB Price: US $200-500 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $200-500/ Piece
Get Latest Price
Port: Qingdao, China
Production Capacity: 1000sets/Year
Payment Terms: L/C, T/T, D/P, Western Union, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: JY350
  • Voltage: 380V
  • Material: Carbon Steel
  • Certification: ISO9001:2008, SGS
  • Warranty: 2 Years
  • Customized: Customized
  • Lined Material: Wear Resistant Rubber
  • Transport Package: Container
  • Origin: Yantai, Shandong, China
  • Type: Hydrocyclone Separator
  • Weight: <1T
  • Material Feature: Heat Resistant
  • Energy Saving: Energy Saving
  • Color: Blue
  • Condition: New
  • Trademark: Jinyang
  • Specification: JYG150 JYG250 etc
  • HS Code: 8474100000
Product Description
Mining Separator Mineral Processing Ore Dressing Cyclone Equipment manufacturer

Jinyang hydrocyclones workmanship have become very mature in mine industry application like grinding & classification, thickening, dewatering, desliming, fine material classification as well as tailings backfill, damming and stacking and also has leading technical advantages in the industry.

hydraulic cyclone is widely used in concentrator of nonferrous and ferrous, chemical, pharmaceutical, ceramics and other industries. It is mainly applied to the process of second paragraph grinding, coarse or concentrates re-grinding and the closed-circuit composed by mechanical grading machine, its grading operation is according to the particle size. cyclone separator widely applied in mine chosen technique in various metal mines. 
It mainly shows in the following works: 
1.Classification for section I closed circuit grinding
2. Classification for section II closed circuit grinding
3. Regrinding for fine mine classification
4. Mud-removing before selection and after selection
5. Dam and backfill for gangue.

1. Before you start commissioning to ensure that all connection points cyclone unit are tightened, remove the pipe, the housing units in a variety of residues, in order to avoid driving after a leak and clogging. Make sure to put into operation the cyclone valve is fully open.
2. The valve can be fully open (such as running a cyclone) or fully closed (such as alternate cyclone), but never allowed in a semi-open state (that never allows the valve to control the flow).
3. If possible, please test with water. Cyclone feed can be pumped or high slot provided. If the pump and cyclone throughput match, the gauge shows a constant reading. To ensure that the pressure gauge reading does not fluctuate, if you need to check the cause significant fluctuations. Equipment requirements to work in not more than 0.3MPa pressure.
4. Equipment running smoothly at normal pressure, the amount you want to check the connection point of leakage, take remedial action when necessary.
5. The residue was checked into the cyclone caused by clogging. Cyclone inlet flow blockage will reduce overflow and grit, grit cyclone grit mouth clogged traffic reduced or even stop, sometimes violently shaking. Such as clogging, should be promptly closed cyclone feed valve, remove the blockage. To prevent clogging, in hydrocyclone group pool feed can be added to prevent the precipitation of coarse material and debris of facilities (such as in addition to chip sieve), while parking in a timely manner when the feed tank empty, so as not to drive again, concentration is too high and cause clogging accident.
6. When the equipment has been running well water test confirmed, you can enter the slurry operation.

FAQ
Q Do you have testing facilities?
A Yes, our factory has all kinds of testing facilities, and I could send their pictures and test documents to you.
Q Will you arrange installation and training?
A Yes, our professional engineers will guide on installation and debugging at site and provide training as well.
Q Do you offer guarantee for the products?
A Yes, we offer one year warranty for the product
Q How to contact us?
A Now, Please send your inquiry email details in the below?~
Send your message to this supplier
Avatar
Ms. Vicky Lu
Manager
*From:
To: Ms. Vicky Lu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category